Planning & Project Controls · EPC

Anyone can make a plan.
Few know how to govern it.

We review, build and implement planning and project controls systems that connect contract, site, progress, forecast and decisions.

S-curve — cumulative progress

Total project WeeksMonths
S-curve - Total project Weekly view - Data date 24/07/26 Incremental bars Cumulative progress (%) 0%25%50%75%100% 02.55.07.510 Data date 56.8% W01W03W05W07W09W11W12
W01Visible date rangeW12
BarsActualBaselineRemainingCurvesActual cumulativeBaseline cumulativeForecast cumulative
The problem

Planning often reaches the decision too late.

Many projects have Primavera, meetings and dashboards. Still, field data arrives late, progress is not traceable and the forecast becomes wishful thinking.

01

Reporting is not control

Moving dates and explaining the past does not protect margin, milestones or contractual position.

02

Site and office speak different languages

The contractual schedule needs real data: quantities, constraints, resources, productivity and releases.

03

Not every delay matters equally

Senior value is separating noise from real impact on critical path, cost and contract risk.

Free

Free Schedule Risk Analysis

Send us a XER or MS Project file and we prepare a short schedule risk report based on min/max durations, a risk library and Monte Carlo simulation.PDF not recommended: without a schedulable file, logic, duration and risk cannot be analysed reliably.

Request free analysis →
Services

Four lines to control time, progress and risk.

PlanBuilt integrates CPM planning, progress measurement, reporting, 4D BIM and delay analysis for industrial and EPC projects. They can be contracted as modular services according to the project phase, urgency and contractual pressure.

Technical stack
Primavera P6MS ProjectSynchro 4DPower BIExcel MacrosSketchUp
Applications

PlanBuilt Control

Project controls applications for engineering, procurement, construction and 4D planning.

PlanBuilt Control extends the PlanBuilt project controls method into practical web applications that connect schedule, progress, engineering releases, procurement, deadlines and forecast decisions.

Explore PlanBuilt Control →
PlanBuilt Method

Site → data → forecast → decision.

The method turns daily site activity into actionable information for management.

01

Model

WBS, baseline, progress rules, milestones and critical path.

02

Capture

Physical progress, constraints, resources, issues and evidence.

03

Analyse

Productivity, variance, consumed float and activities at risk.

04

Forecast

Realistic dates based on logic, performance and constraints.

05

Decide

Impact on time, cost, contract and recovery options.

06

Adjust

Re-sequencing, mitigation and weekly system learning.

Sectors

Where the schedule is critical.

Industrial, energy and EPC environments with schedule pressure, complex interfaces and contractual exposure.

Energy & renewables

Wind · Solar · Hybrid · BESS

Oil & Gas / Process

Plants · Terminals · Storage

Steel industry

Steel plants · Rolling mills · Furnaces · Utilities

Data centres

High density · Accelerated delivery

Infrastructure

Civil · Industrial · Buildings

Insights

Technical knowledge, not marketing.

Practical analysis on planning, project controls and delay analysis, integrated into the PlanBuilt blog.

Next step

Your schedule says the project finishes on time. Is it true?

Tell us the current phase and what worries you about the schedule. We will come back with an honest first read.