CPM schedule
WBS structure, contractual milestones, precedence logic, durations, critical path and baseline in Primavera P6 or MS Project.
We prepare the schedule, resources, programme narrative and core deliverables for industrial and EPC bids. When the sequence needs to be understood visually, we add 4D BIM planning as a separate scope.
The aim is not a decorative Gantt chart: it is a logic that explains how the work will be executed, what resources it requires and what risks are embedded in the offer.
WBS structure, contractual milestones, precedence logic, durations, critical path and baseline in Primavera P6 or MS Project.
Resource loading, productivity assumptions, work fronts, key constraints and execution performance assumptions.
Technical narrative explaining execution strategy, sequence, assumptions, exclusions, risks and the logic behind the bid duration.
S-curve, histograms, milestones, executive summary and deliverables ready for internal review or client submission.
We check calendars, constraints, open logic, float, weak sequences and points that may compromise the offer.
When a model exists and there is enough time, we link the sequence to the model to explain construction, access and critical interfaces.
Not every tender needs 4D. We propose it when sequence, access, interfaces or phasing are part of the technical value of the proposal.
The client understands how the project will be built, not only when each activity starts and finishes.
Interfaces between disciplines, areas, access, installation, testing and commissioning are identified.
The technical narrative becomes stronger because it connects programme, model and construction methodology.
Prices are indicative and depend on scope, input quality, urgency, number of disciplines and required level of detail.
Base programme, milestones, main logic, simple S-curve and consistency review.
Detailed programme, resources, technical narrative, histograms, assumptions and tender deliverables.
Full package for a complex tender with multiple disciplines, interfaces, scenarios and senior review.
4D BIM is priced separately when there is a model, enough time and real tender value.
We review the tender documents, scope, BOQ, milestones, constraints, model and bid strategy.
We build the WBS, sequence, calendars, relationships and critical path.
We assign crews, productivities, curves, histograms and execution assumptions.
We identify weak points, suspicious float, constraints and high-impact interfaces.
We write the technical explanation of duration, strategy, sequence and assumptions.
We prepare editable files and the final package for internal review or client submission.
Send us the scope, tender documents or available information and we will tell you which package level fits your tender.